Last update: 29/08/2023, 09:40
R18XBLV20, R18XBLV26
Step | Action |
---|---|
1 | Holding the power head angled slightly down at the back, align the square openings of the lower blower tubes and push them partially together. |
2 | Now, line up the opening of the power head with the vacuum tube. Then, as you push them together, make sure this locking pin aligns with the hole in the powerhead. |
3 | They are properly connected when you hear this tab click into place. To secure the connection, turn the locking pin in a clockwise direction. |
4 | Because of the safety feature that prevents the motor from running when the tube is removed, it’s important that the locking pin is screwed in all the way to finger-tight. |
5 | At the top of the handle there is a red LED. If this blinks, it means the locking pin hasn’t been fully tightened. If that happens, check that the pin is finger-tight until the LED goes out. |